2385 Fer-Pal Construction USA LLC — Trenchless Water Main Rehabilitation
Municipal & Utility Infrastructure

We rehabilitate water mains without opening the street.

Fer-Pal Construction USA LLC delivers trenchless CIPP lining and pipe bursting for aging municipal water systems — restoring pipe integrity with minimal excavation, minimal disruption, and no compromise on the water underneath.

2007Organized & operating
Taylor, MIHeadquarters
001891956State ID number
Host Pipe CIPP Liner
Drag to compare — corroded host pipe vs. cured-in-place liner
Company Record

Built on infrastructure, registered to work on it.

Fer-Pal Construction USA LLC has specialized in water main rehabilitation since its organization in 2007, bringing trenchless technology to municipalities that need their water infrastructure restored — not replaced, and not dug up.

Who We Are

A specialist contractor, not a generalist.

Every project we take on is water main rehabilitation — cured-in-place pipe lining, pipe bursting, and trenchless point repair. That focus is why municipalities and utility departments bring us in when a line needs to be saved, not torn out.

Managed on the ground by Donna Farner, our teams plan around live utility corridors, traffic patterns, and water service continuity — so the street stays open while the pipe underneath gets fixed.

Registered Entity
Legal Name
Fer-Pal Construction USA LLC
ID Number
001891956
Manager
Donna Farner
Principal Office
26187 Northline Road, Taylor, MI 48180, USA
Focus
Water Main Rehabilitation
What We Do

Trenchless solutions for pipes that still have work left in them.

Each service is built around one outcome: a restored water main with the least possible disruption to the street, the sidewalk, and the people living above it.

01

CIPP Lining

Cured-in-place pipe lining installs a new structural pipe inside the old one — sealing corrosion and leaks without excavation.

02

Pipe Bursting

We fracture the deteriorated host pipe outward while simultaneously pulling a new pipe into place along the same alignment.

03

Water Main Rehabilitation

Full-line restoration programs for municipal water systems, scoped around service continuity and long-term asset life.

04

Trenchless Point Repair

Targeted structural repair at isolated failure points, without opening the full length of the main.

05

CCTV & Condition Assessment

Camera inspection and pipe condition surveys that determine the right rehabilitation method before work begins.

06

Municipal Program Delivery

Coordination with utility departments and municipalities to sequence rehabilitation across multiple street segments.

How a Line Gets Rehabilitated

Five steps, one open street.

The sequence is fixed for a reason — each stage confirms the pipe is ready for the next, so the liner goes in clean and cures correctly the first time.

01 / Assess

Site & CCTV Inspection

Camera survey confirms the pipe's condition and the rehabilitation method it calls for.

02 / Prepare

Cleaning

The host pipe is cleaned to bare wall so the new liner bonds properly.

03 / Install

Liner Insertion / Bursting

The new liner is inserted, or the old pipe is burst and replaced in the same alignment.

04 / Cure

Curing & Inversion

The liner is cured in place, forming a structural pipe within the existing corridor.

05 / Close

Reinstatement

Service connections are reinstated and the finished line is inspected before handoff.

Get In Touch

Tell us about the line that needs work.

Reach out with a location, pipe material, and timeline — our team will follow up to scope the right rehabilitation method.